SHAKER INCUBATOR – WITH COOLING

  •  Construction -: Double walled construction with backside triple.
  •  Insulation -: 3 Inch Thick PUF Insulation ensures stable temperature & reduced energy consumption.
  •  Observation Door -: Full view observation Acrylic door with gasket to observe sample inside the chamber.
  •  Heating System -: High quality S.S. Tubular Heaters are used for better heating.
  •  Air Circulation -: Motorized Blower at back side of the chamber for recirculation of air develops unique air flow system which ensures maximum uniform temperature distribute inside the chamber should be maintained.
    Unique air flow assures quick recovery after door openings
  •  Blower Motor -: 1/12 HP, TEFC, F-class insulation, Single Phase, 1440 RPM, 230 Volts.
  •  Safety Features -: 1) Safety standby thermostat to cut of the heater supply in case of overshoot of temperature.2) Compressor ON delay timer (2 min) to safe guard the compressor. 3) In built over load protector provided for hermetically sealed compressor.
  •  Refrigeration System -: CFC Free hermitically sealed Emerson Copland make compressor for better cooling with R 134 A for better cooling with ECO friendly refrigerant with time delay to safe guard compressor system.
  •  Supply -: 230 V AC, Single Phase , 50 Hz
  •  Standard Model -: Inside S.S.304 mirror finish & Outer Mild steel (CRCA) sheet with powder coated.
  •  Temperature Range -: 5° C to 60°C
  •  Temperature Accuracy –: ± 0.5° C.
  •  Shaking Mode -: Orbital
  •  Shaking Speed -: 40 to 200 RPM
  •  Speed Indication -: Digital
  •  Control System -: Imported Microprocessor based auto tuned PID controller with CE mark & dual display of set value & process value.

TECHNICAL SPECIFICATION

FLASK SIZE

REQUIREMENT FOR INSTALLATION

  1. Place the chamber where ventilation is good.
  2. The chamber must be operated in an ambient of 22◦ C ~ 30◦ C.
  3. Leave minimum 50 mm. Space from the sides and leave 300 mm. Space from the backside.
  4. Place the chamber horizontally levelled.
  5. Give stabilized electric supply (230V ±5%, 50Hz, 1 Phase, 20 Amp). It is recommended to use a voltage stabilizer (KVA).
  6. Proper grounding of the chamber to get satisfactory operation of chamber.
  7. Do not test any product in the chamber, which is capable of generating combustible mixtures.
  8. Stabilized: 230V AC single-phase supply. MCB with proper earthling.